Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-84 ' (1) ·
'CROOKED CREEK ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'Little Haw Creek ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'Middle Haw Creek ' (1) ·
'N Fork Loxahatchee River' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-91 N/S TPK ' (1) ·
'US-192 ' (1)
'Benoist Farms Rd ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'CR603(JOHNSTON RD)' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'DARWIN BLVD ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'LYONS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-40 ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'ST LUCIE BLVD ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1)
700209 (1) ·
790018 (1) ·
790920 (1) ·
890015 (1) ·
894014 (1) ·
930006 (1) ·
930294 (1) ·
931011 (1) ·
934142 (1) ·
934499 (1) ·
934711 (1) ·
934731 (1) ·
935501 (1) ·
936776 (1) ·
940041 (1) ·
940050 (1) ·
940053 (1) ·
940071 (1) ·
945262 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'I-95 / SR 882 ' (1) ·
'I-95 over US-192 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'No. City Line Boca Raton ' (1) ·
'SR-40 - Little Haw Creek ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-710 TPK Interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.