Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12261 (1) ·
12273 (1) ·
13757 (1) ·
13763 (1) ·
13801 (1) ·
13803 (1) ·
13804 (1) ·
15192 (1) ·
15272 (1) ·
15273 (1) ·
15285 (1) ·
15290 (1) ·
15765 (1) ·
15887 (1) ·
15967 (1) ·
16083 (1) ·
16102 (1) ·
17901 (1) ·
17902 (1) ·
17911 (1) ·
18716 (1) ·
18727 (1) ·
18770 (1) ·
19196 (1) ·
19236 (1) ·
19530 (1)
'BRANCH OF ICWW ' (1) ·
'BRANCH OF INDIAN RIVER ' (1) ·
'Canal ' (1) ·
'COLLIER CREEK ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Crane Creek ' (1) ·
'Drainage Ditch ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Miller Creek ' (1) ·
'MOORES CREEK ' (1) ·
'Nova Canal ' (1) ·
'PERENNIAL CANAL ' (1) ·
'Range Line Canal ' (1) ·
'Rowland Canal ' (1) ·
'Samsula Canal ' (1) ·
'SCOTTS CANAL ' (1) ·
'Sweetwater Creek ' (1) ·
'Trib to Spruce Creek ' (1)
'16th Street ' (1) ·
'Big Tree Road ' (1) ·
'Dubber Road ' (1) ·
'FLEMING STREET ' (1) ·
'Golfview Ave ' (1) ·
'Golfview Avenue ' (1) ·
'Hunting Camp Road ' (1) ·
'HURON WAY ' (1) ·
'ISLAND RD. ' (1) ·
'JUPITER BEACH RD ' (1) ·
'MONET ROAD ' (1) ·
'NORTH 2ND STREET ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'Samsula Drive ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'Spotted Fawn Way ' (1) ·
'SR 614 (INDRIO-RD)' (1) ·
'SR-40 ' (1) ·
'SR-5A ' (1) ·
'STAR ISLAND WAY ' (1) ·
'Tomoka Farms Rd ' (1) ·
'Tucker Lane ' (1) ·
'West Farms Road ' (1)
704093 (1) ·
704099 (1) ·
704100 (1) ·
704203 (1) ·
705601 (1) ·
790017 (1) ·
790183 (1) ·
794008 (1) ·
794019 (1) ·
794045 (1) ·
794154 (1) ·
794184 (1) ·
794185 (1) ·
884081 (1) ·
885604 (1) ·
894017 (1) ·
894018 (1) ·
894048 (1) ·
894056 (1) ·
895501 (1) ·
934125 (1) ·
934905 (1) ·
936500 (1) ·
936551 (1) ·
940137 (1) ·
945000 (1)
'.2 mi. N of Port St. John' (1) ·
'.7 mi S of Taylor Rd ' (1) ·
'.9 Mi. N of Port St. John' (1) ·
'0.1 Mi North of Taylor Rd' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.4 Mi. S. of Beville Rd ' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'0.6 Mi W of SR-11 ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.2 miles South of SR-520' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'At 74th Avenue ' (1) ·
'At Lake Washington Rd ' (1) ·
'SR-5A - Big Tree Rd ' (1)
26240578 (1) ·
26501416 (1) ·
26535784 (1) ·
26561862 (1) ·
27011700 (1) ·
27044012 (1) ·
27044356 (1) ·
27085780 (1) ·
27104516 (1) ·
27270218 (1) ·
27311800 (1) ·
27375400 (1) ·
27474990 (1) ·
28042875 (1) ·
28085200 (1) ·
28204430 (1) ·
28272397 (1) ·
28275799 (1) ·
28592979 (1) ·
28594816 (1) ·
29032507 (1) ·
29042244 (1) ·
29051568 (1) ·
29095834 (1) ·
29101368 (1) ·
29131903 (1)
80040825 (1) ·
80042000 (1) ·
80080433 (1) ·
80080562 (1) ·
80111512 (1) ·
80120021 (1) ·
80142587 (1) ·
80162888 (1) ·
80193068 (1) ·
80262200 (1) ·
80284500 (1) ·
80285590 (1) ·
80291127 (1) ·
80373635 (1) ·
80424100 (1) ·
80470960 (1) ·
80494783 (1) ·
80495800 (1) ·
81012484 (1) ·
81013312 (1) ·
81022736 (1) ·
81025853 (1) ·
81040532 (1) ·
81040663 (1) ·
81040678 (1) ·
81194815 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 26 results in range #1 to #26.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)