Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Boynton Inlet ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'FEC Railroad ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'MIAMI CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (STUART INT) ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-40 ' (1) ·
'TEN MILE CREEK ' (1) ·
'WPB CANAL C-51 ' (1)
'Atlantic Avenue ' (1) ·
'Banana River Drive' (1) ·
'CORKSCREW BLVD. ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'I-95 ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'SR A1A ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-80 ' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SUMMIT BLVD ' (1) ·
'US-98 (SR-80) ' (1) ·
'WOOLBRIGHT ROAD ' (1)
704063 (1) ·
790193 (1) ·
890068 (1) ·
890083 (1) ·
890107 (1) ·
930026 (1) ·
930029 (1) ·
930030 (1) ·
930053 (1) ·
930056 (1) ·
930061 (1) ·
930064 (1) ·
930142 (1) ·
930214 (1) ·
930338 (1) ·
930360 (1) ·
930416 (1) ·
934201 (1) ·
934502 (1) ·
934908 (1) ·
940015 (1) ·
940047 (1) ·
940050 (1) ·
940072 (1)
'.25m W of US-1 on US-98 ' (1) ·
'.2mi East of US-27 ' (1) ·
'0.25MI E OF US 1 ' (1) ·
'0.2MI S OF EDWARDS RD ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'500FT WEST OF I-95 ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'At East Canal St. ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'I-95 over SR-40 ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
26210242 (1) ·
26220464 (1) ·
26274181 (1) ·
26282666 (1) ·
26305220 (1) ·
26324386 (1) ·
26395130 (1) ·
26395767 (1) ·
26403272 (1) ·
26411023 (1) ·
26411370 (1) ·
26411885 (1) ·
26413511 (1) ·
26423954 (1) ·
26570930 (1) ·
27035280 (1) ·
27092801 (1) ·
27121998 (1) ·
27222822 (1) ·
27240944 (1) ·
27241547 (1) ·
27263922 (1) ·
28085715 (1) ·
29152514 (1)
80023594 (1) ·
80032041 (1) ·
80033598 (1) ·
80034367 (1) ·
80035127 (1) ·
80042609 (1) ·
80043210 (1) ·
80044370 (1) ·
80072029 (1) ·
80081956 (1) ·
80101495 (1) ·
80180781 (1) ·
80192646 (1) ·
80195431 (1) ·
80215950 (1) ·
80230229 (1) ·
80235220 (1) ·
80362216 (1) ·
80400416 (1) ·
80401144 (1) ·
80402235 (1) ·
80424470 (1) ·
80482588 (1) ·
81065740 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.