Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Kind 043a:
Prestressed concrete
& Superstructure 059:
Satisfactory
& Direction 102:
2 - way
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'City St. & Crane Creek ' (1) ·
'Drainage Ditch ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Gabordy's Canal ' (1) ·
'Halifax Canal ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'Nav. Banana River Canal ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'US-17/92 ' (1)
'Center Avenue ' (1) ·
'Citrus Blvd ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'DUDA ROAD ' (1) ·
'Enterprise Rd. ' (1) ·
'Girard Blvd. ' (1) ·
'Hull Road ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'Riverside Drive ' (1) ·
'SAVONA BLVD. ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-472 ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'US-1 ' (1) ·
'Willowood Drive ' (1)
700006 (1) ·
700129 (1) ·
704016 (1) ·
704032 (1) ·
704203 (1) ·
790055 (1) ·
790079 (1) ·
790191 (1) ·
795521 (1) ·
795713 (1) ·
880051 (1) ·
880077 (1) ·
885601 (1) ·
930235 (1) ·
934516 (1) ·
934519 (1) ·
940035 (1) ·
945256 (1)
'.21 E of Minton Rd. ' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1MI W of US-1 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Intersection w LPGA BL' (1) ·
'At Lake Washington Rd ' (1) ·
'Citrus Blvd - I-95 ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'Hull Road - I-95 ' (1) ·
'SR-472 over US-17/92 ' (1) ·
'US-1 - Crane Cr & City St' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.