Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'Cabana Colony Circle ' (1) ·
'CANAL ' (1) ·
'CR 702 45th Street ' (1) ·
'CSX RAILROAD ' (1) ·
'E-2 Canal ' (1) ·
'Loxahatchee River ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'Turnpike (SR-91) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB Drainage Canal ' (1) ·
'WPB STUB CANAL ' (1)
'45TH STREET ' (1) ·
'45th Street CR-702' (1) ·
'BELVEDERE RD ' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CENTRE PK. DR. N. ' (1) ·
'CONGRESS AVE ' (1) ·
'HAVERHILL ROAD ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Pioneer Road ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'Prosperity Farms R' (1) ·
'Riverbend Park Rd ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SUMMIT BLVD ' (1)
930235 (1) ·
930294 (1) ·
930367 (1) ·
930520 (1) ·
930540 (1) ·
934100 (1) ·
934166 (1) ·
934176 (1) ·
934178 (1) ·
934208 (1) ·
934228 (1) ·
934256 (1) ·
934258 (1) ·
934259 (1) ·
934721 (1) ·
937709 (1) ·
937714 (1) ·
937715 (1) ·
937716 (1)
'.25 Mi E of AUSTRALIAN ' (1) ·
'.5mi East US1 Lakeworth ' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.0 M West of Haverhill R' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'At Exit 74 ' (1) ·
'I-95 / SR 882 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.