Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-1 Canal ' (1) ·
'C-51 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'E3-canal ' (1) ·
'Eau Gallie River ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'I-4 ' (1) ·
'L-5 Canal ' (1) ·
'Lateral A Canal ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Rio Mar Bay ' (1) ·
'ROY'S SWALE ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 N/S TPK ' (1) ·
'SR91 TPK (JUPITER INT) ' (1)
'Apollo Boulevard ' (1) ·
'Bay Drive ' (1) ·
'Benoist Farms Rd ' (1) ·
'CR-630 (41st St.) ' (1) ·
'Enterprise Rd. ' (1) ·
'HOOD RD 110.944 ' (1) ·
'Levee Road ' (1) ·
'Melaleuca Lane ' (1) ·
'Orange camp Rd. ' (1) ·
'Palm Bay Parkway ' (1) ·
'River Drive ' (1) ·
'SILVER FOX LANE ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'TEQUESTA DRIVE ' (1)
705604 (1) ·
705924 (1) ·
790191 (1) ·
790211 (1) ·
884104 (1) ·
885811 (1) ·
885812 (1) ·
894042 (1) ·
930441 (1) ·
930447 (1) ·
930803 (1) ·
930804 (1) ·
931011 (1) ·
931012 (1) ·
934361 (1) ·
934711 (1) ·
936776 (1) ·
940143 (1) ·
940152 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.1 Mile West of A1A ' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'100Ft. South of Bay Drive' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-710 TPK Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.