Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'C-1 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'CAMINO CANAL ' (1) ·
'DRAINAGE CANAL ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'GARDEN CANAL ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Indian River Relief ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'Reed Canal ' (1) ·
'Salerno Creek ' (1) ·
'Troup Indiantown Canal ' (1)
'2nd AVENUE NORTH ' (1) ·
'34th Avenue ' (1) ·
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CR-880 ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'DUDA ROAD ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'Palm Bay Parkway ' (1) ·
'Saul Street ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR A1A ' (1) ·
'SR-715 ' (1) ·
'SR-A1A ' (1) ·
'US 192 WB ' (1) ·
'US-98 SR700 US441 ' (1)
700233 (1) ·
705924 (1) ·
796518 (1) ·
885813 (1) ·
894053 (1) ·
894055 (1) ·
930465 (1) ·
930471 (1) ·
930910 (1) ·
934179 (1) ·
934364 (1) ·
934519 (1) ·
934905 (1) ·
935206 (1) ·
935207 (1) ·
940003 (1) ·
940004 (1) ·
940085 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3 Miles North of SR 60 ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'7.7Mi W OF SR-80 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Reed Canal Road ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-700 CANAL POINT ' (1) ·
'US 192 WB over Indian Riv' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)