Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CHENEY WAY/CSX RR ' (1) ·
'CYPRESS CREEK ' (1) ·
'Indian River IWW ' (1) ·
'L-30 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'None ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-404 ' (1) ·
'Tillman Canal ' (1)
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'NB I 95 to Gateway' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'SR-507 NB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US-1 SB ' (1) ·
'US-192 EB ' (1) ·
'WB Martin Downs Bd' (1) ·
'WB SR808 Glades Rd' (1)
700075 (1) ·
700181 (1) ·
700185 (1) ·
890143 (1) ·
930245 (1) ·
930435 (1) ·
934128 (1) ·
934129 (1) ·
934155 (1) ·
934156 (1) ·
934222 (1) ·
934901 (1) ·
934916 (1) ·
934936 (1) ·
937706 (1)
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'800 ft West of I 95 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'SR-507 NB - Tillman Canal' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'US-1 SB - SR-404 ' (1) ·
'US-192 EB - Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)