Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'CYPRESS CREEK ' (1) ·
'FL. TURNPIKE ' (1) ·
'Indian River IWW ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'N Fork St. Lucie River ' (1) ·
'None ' (1) ·
'Pine Street ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Tillman Canal ' (1)
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'NB I 95 to Gateway' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'SR-507 NB ' (1) ·
'SR-528 EB ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US-192 EB ' (1) ·
'WB Martin Downs Bd' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB SR808 Glades Rd' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700151 (1) ·
700181 (1) ·
700185 (1) ·
890143 (1) ·
930245 (1) ·
930435 (1) ·
934128 (1) ·
934129 (1) ·
934155 (1) ·
934156 (1) ·
934222 (1) ·
934345 (1) ·
934346 (1) ·
934901 (1) ·
934916 (1) ·
934925 (1) ·
934926 (1) ·
934936 (1) ·
934938 (1) ·
934939 (1) ·
934945 (1) ·
934946 (1) ·
934951 (1) ·
934952 (1) ·
940145 (1)
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'2mi. East of SR-91 ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'800 ft West of I 95 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'SR-507 NB - Tillman Canal' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'US-192 EB - Indian River ' (1)
26195316 (1) ·
26195370 (1) ·
26195525 (1) ·
26220610 (1) ·
26233917 (1) ·
26233970 (1) ·
26252703 (1) ·
26252771 (1) ·
26290212 (1) ·
26290213 (1) ·
26290245 (1) ·
26322077 (1) ·
26325800 (1) ·
26342010 (1) ·
26342072 (1) ·
26422263 (1) ·
26455824 (1) ·
26455826 (1) ·
26525635 (1) ·
26525705 (1) ·
27103152 (1) ·
27161886 (1) ·
28004740 (1) ·
28050237 (1) ·
28244125 (1)
80041200 (1) ·
80043939 (1) ·
80043945 (1) ·
80051706 (1) ·
80051771 (1) ·
80071555 (1) ·
80071862 (1) ·
80072169 (1) ·
80074383 (1) ·
80074641 (1) ·
80074643 (1) ·
80084780 (1) ·
80084942 (1) ·
80084971 (1) ·
80085013 (1) ·
80101305 (1) ·
80101307 (1) ·
80101583 (1) ·
80101586 (1) ·
80135984 (1) ·
80153061 (1) ·
80191739 (1) ·
80352939 (1) ·
80371970 (1) ·
80493553 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.