Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12149 (1) ·
12153 (1) ·
12177 (1) ·
12179 (1) ·
12182 (1) ·
12202 (1) ·
12206 (1) ·
15790 (1) ·
15791 (1) ·
15796 (1) ·
15813 (1) ·
15814 (1) ·
15849 (1) ·
15850 (1) ·
15854 (1) ·
15855 (1) ·
15857 (1) ·
15858 (1) ·
15983 (1) ·
15992 (1) ·
15993 (1) ·
15994 (1) ·
15997 (1) ·
16000 (1) ·
17855 (1) ·
19474 (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SANDALFOOT BLVD EB' (1) ·
'SANDALFOOT BLVD WB' (1) ·
'SR-3 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR91 SB ON RP 81.9' (1)
700072 (1) ·
700077 (1) ·
700081 (1) ·
700110 (1) ·
700112 (1) ·
700115 (1) ·
700143 (1) ·
700147 (1) ·
931008 (1) ·
934205 (1) ·
934206 (1) ·
934220 (1) ·
934277 (1) ·
934278 (1) ·
934404 (1) ·
934405 (1) ·
934420 (1) ·
934421 (1) ·
934428 (1) ·
934441 (1) ·
937352 (1) ·
937361 (1) ·
937362 (1) ·
937363 (1) ·
937703 (1) ·
937707 (1)
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1MI W OF SR 809 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'At US-441/SR-7 ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-404 EB - Banana River ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-528 EB - Sykes Creek ' (1) ·
'SR-528 WB - Indian River ' (1)
26200900 (1) ·
26201002 (1) ·
26221050 (1) ·
26221083 (1) ·
26225750 (1) ·
26225797 (1) ·
26272575 (1) ·
26413242 (1) ·
26413281 (1) ·
26422207 (1) ·
26423784 (1) ·
26423785 (1) ·
26430400 (1) ·
26430410 (1) ·
26435320 (1) ·
26435409 (1) ·
26445565 (1) ·
26445590 (1) ·
28122256 (1) ·
28122319 (1) ·
28123691 (1) ·
28123758 (1) ·
28241003 (1) ·
28241828 (1) ·
28241875 (1) ·
28242777 (1)
80040030 (1) ·
80040084 (1) ·
80041664 (1) ·
80041713 (1) ·
80054082 (1) ·
80054091 (1) ·
80074091 (1) ·
80074092 (1) ·
80103398 (1) ·
80120021 (1) ·
80120952 (1) ·
80120955 (1) ·
80133989 (1) ·
80134000 (1) ·
80134407 (1) ·
80134460 (1) ·
80135980 (1) ·
80374128 (1) ·
80374130 (1) ·
80384625 (1) ·
80390039 (1) ·
80390071 (1) ·
80413925 (1) ·
80422154 (1) ·
80440519 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 26 results in range #1 to #26.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)