Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Direction 102: 1 - way & Scour 113: Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
2 (1) · 3 (1) · 4 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Kind 043a:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102: (Click arrow to add another value)
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 5 results in range #1 to #5.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)