Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'C-23 Canal ' (1) ·
'CR 708 ' (1) ·
'CR 709 & FECRR ' (1) ·
'Drainage Canal ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'None ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'St. Lucie Canal ' (1)
890111 (1) ·
890117 (1) ·
890118 (1) ·
890121 (1) ·
890122 (1) ·
890130 (1) ·
890131 (1) ·
890132 (1) ·
890133 (1) ·
930172 (1) ·
930173 (1) ·
930380 (1) ·
930384 (1) ·
930390 (1) ·
930435 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940126 (1) ·
940127 (1)
'.75 Mile South Midway Rd.' (1) ·
'0.75 mile South of SR 708' (1) ·
'1 mi. N of Cnty Rd 708 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'Tpk. SR 706 Interchange ' (1)
26325800 (1) ·
26461850 (1) ·
26461960 (1) ·
26560369 (1) ·
26560606 (1) ·
26561100 (1) ·
27023771 (1) ·
27023967 (1) ·
27033218 (1) ·
27033286 (1) ·
27070958 (1) ·
27071400 (1) ·
27072925 (1) ·
27073032 (1) ·
27121953 (1) ·
27171853 (1) ·
27172347 (1) ·
27211679 (1) ·
27211974 (1) ·
27234232 (1) ·
27234592 (1) ·
27281041 (1) ·
27281411 (1)
80041200 (1) ·
80054560 (1) ·
80054725 (1) ·
80085370 (1) ·
80090683 (1) ·
80091289 (1) ·
80140214 (1) ·
80140445 (1) ·
80141809 (1) ·
80142079 (1) ·
80160809 (1) ·
80161732 (1) ·
80164549 (1) ·
80164845 (1) ·
80233923 (1) ·
80234014 (1) ·
80240091 (1) ·
80244973 (1) ·
80245174 (1) ·
80251481 (1) ·
80251602 (1) ·
80252971 (1) ·
80254109 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)