Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Burns Road ' (1) ·
'CR-5A ' (1) ·
'CYPRESS CREEK ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Indian River IWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Loxahatchee Slough ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR 91 TPK ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
Lake Washington Road (1)
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EB PGA Blvd. ' (1) ·
'EB SR 786 ' (1) ·
'EB SR-710 ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I-95 ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR786 WB to SB I95' (1) ·
'US-192 EB ' (1) ·
'US-192 WB ' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR 786 ' (1) ·
'WB SR-710 ' (1) ·
I-95 SB (1)
700043 (1) ·
700156 (1) ·
700174 (1) ·
700181 (1) ·
930106 (1) ·
930267 (1) ·
930268 (1) ·
930335 (1) ·
930336 (1) ·
930349 (1) ·
930381 (1) ·
930388 (1) ·
930419 (1) ·
930491 (1) ·
930492 (1) ·
930493 (1) ·
930518 (1) ·
930521 (1) ·
930526 (1) ·
930535 (1) ·
930536 (1) ·
934128 (1) ·
934129 (1) ·
934148 (1) ·
934149 (1)
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'1st overpass east of I-95' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'US-192 EB - Indian River ' (1) ·
'US-192 WB-Indian River ' (1) ·
I-95 NB and CR-5A (1) ·
I-95 SB -Lk Washington Rd (1)
26482992 (1) ·
26483050 (1) ·
26483417 (1) ·
26483495 (1) ·
26492016 (1) ·
26492039 (1) ·
26494986 (1) ·
26495114 (1) ·
26502240 (1) ·
26502290 (1) ·
26502600 (1) ·
26503600 (1) ·
26503900 (1) ·
26504000 (1) ·
26504098 (1) ·
26504600 (1) ·
26504915 (1) ·
26525635 (1) ·
26525705 (1) ·
26525829 (1) ·
26525885 (1) ·
28050237 (1) ·
28050339 (1) ·
28084584 (1) ·
28461701 (1)
80035722 (1) ·
80040100 (1) ·
80043939 (1) ·
80043945 (1) ·
80050893 (1) ·
80050894 (1) ·
80054200 (1) ·
80054600 (1) ·
80054615 (1) ·
80054982 (1) ·
80055205 (1) ·
80060655 (1) ·
80060720 (1) ·
80060970 (1) ·
80075174 (1) ·
80075197 (1) ·
80075215 (1) ·
80075217 (1) ·
80101483 (1) ·
80101580 (1) ·
80352939 (1) ·
80352988 (1) ·
80422180 (1) ·
80533778 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)