Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Halifax River IWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'US-92 ' (1)
'6 Ave S to NB I-95' (1) ·
'6TH AVE SO. EB ' (1) ·
'6TH AVE SO. WB ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1) ·
'WB SR 802 Lake Ave' (1)
790021 (1) ·
790071 (1) ·
790072 (1) ·
790097 (1) ·
790174 (1) ·
790175 (1) ·
790187 (1) ·
790188 (1) ·
930104 (1) ·
930261 (1) ·
930262 (1) ·
930318 (1) ·
930508 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
934302 (1) ·
934307 (1)
'0.6 mile South of SR 882 ' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB over US-92 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'US-92 EB - Halifax River ' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB - Halifax Ri IWW' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)