Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'Port Malabar Bl EB' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1)
704150 (1) ·
704151 (1) ·
705910 (1) ·
934420 (1) ·
934421 (1) ·
935209 (1) ·
935210 (1) ·
935307 (1) ·
935308 (1) ·
937352 (1) ·
937361 (1) ·
937362 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
949901 (1) ·
949902 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)