Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'C-17 Canal ' (1) ·
'Dirksen Drive ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Padgett Creek ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-44 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'US-1 ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1) ·
'West Palm Beach Canal ' (1)
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'EB SR808 Glades Rd' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Blue Heron Blvd' (1) ·
'WB SR808 Glades Rd' (1) ·
'WB US 98 SR 80 ' (1)
790042 (1) ·
790064 (1) ·
790082 (1) ·
790083 (1) ·
790941 (1) ·
930183 (1) ·
930184 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930210 (1) ·
930246 (1) ·
930247 (1) ·
930371 (1) ·
930410 (1) ·
930461 (1) ·
930467 (1) ·
930491 (1)
'.7mi. E of Congress Ave. ' (1) ·
'1 Mile East of I-95 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1st overpass east of I-95' (1) ·
'800 ft West of I 95 ' (1) ·
'Boca Raton ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'I-95 NB over US-1 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR-7 & SR-80 intersection' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.