Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvede to NB I-95' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-4 Ramp ' (1) ·
'I-4 WB ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 WB ' (1) ·
'SR786 WB to SB I95' (1) ·
'US-192 EB ' (1) ·
'US-192 WB ' (1) ·
'WB SR704 to SB I95' (1) ·
Overpass Ramp (1)
700061 (1) ·
700110 (1) ·
700137 (1) ·
700174 (1) ·
700181 (1) ·
700218 (1) ·
790023 (1) ·
790106 (1) ·
930384 (1) ·
930388 (1) ·
930469 (1) ·
930485 (1) ·
930488 (1) ·
930489 (1) ·
930493 (1) ·
930494 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'I-4 EB Ramp - I-95 ' (1) ·
'I-4 WB over I-4 EB Ramp B' (1) ·
'I-95 SR 704 interchange ' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'US-192 EB - Indian River ' (1) ·
'US-192 WB-Indian River ' (1) ·
0.7 Mile N of SR-528 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)