Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930154 (1) ·
930187 (1) ·
930188 (1) ·
930198 (1) ·
930199 (1) ·
930226 (1) ·
930245 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
934420 (1) ·
934421 (1) ·
934925 (1) ·
934926 (1) ·
935209 (1) ·
935210 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'800 ft West of I 95 ' (1) ·
'Boca Raton ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)