Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E/B S.R. 704 ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'EB SR706 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Spanish River ' (1) ·
'WB SR 706 ' (1)
700030 (1) ·
700031 (1) ·
700117 (1) ·
790004 (1) ·
790087 (1) ·
890066 (1) ·
930154 (1) ·
930226 (1) ·
930453 (1) ·
930454 (1) ·
930486 (1) ·
930487 (1) ·
930506 (1) ·
930507 (1) ·
934160 (1) ·
934161 (1) ·
940049 (1) ·
940076 (1) ·
940082 (1) ·
940096 (1) ·
940097 (1) ·
940951 (1)
'0.37MI N OF SR-712 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'Just North of SR70 on I95' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'US-1 NB - FECRR ' (1) ·
'US-1 SB over FECRR ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26231074 (1) ·
26231130 (1) ·
26412597 (1) ·
26412600 (1) ·
26422200 (1) ·
26525465 (1) ·
26525529 (1) ·
26560245 (1) ·
26560246 (1) ·
27070362 (1) ·
27154481 (1) ·
27154501 (1) ·
27224619 (1) ·
27224640 (1) ·
27264995 (1) ·
27265210 (1) ·
28243313 (1) ·
28243314 (1) ·
28243318 (1) ·
28493662 (1) ·
28493748 (1)
80024000 (1) ·
80025300 (1) ·
80035976 (1) ·
80040125 (1) ·
80040991 (1) ·
80040992 (1) ·
80041209 (1) ·
80041536 (1) ·
80050063 (1) ·
80162980 (1) ·
80210806 (1) ·
80210855 (1) ·
80231097 (1) ·
80231141 (1) ·
80233690 (1) ·
80233991 (1) ·
80375518 (1) ·
80375608 (1) ·
80375690 (1) ·
80511310 (1) ·
80511328 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)