Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700157 (1) ·
700158 (1) ·
700159 (1) ·
700184 (1) ·
700190 (1) ·
700194 (1) ·
700206 (1) ·
700210 (1) ·
700212 (1) ·
700213 (1) ·
700214 (1) ·
700224 (1) ·
704013 (1)
'0.4 mile East of SR-3 ' (1) ·
1.3 Mi. East of CR-507 (1) ·
1.9MI E of Babcock St. (1) ·
SR-46 over Six Mile Cr (1) ·
SR-507 SB-Tillman Canal (1) ·
SR-518 over Indian River (1) ·
SR-A1A SB- George King (1) ·
US-1 over Horse Creek (1) ·
US-1 over Sebastian River (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 WB - Sawgrass Cr. (1) ·
US-192 WB- St Johns River (1) ·
Valkaria Road and I-95 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)