Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR 807 ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR 807 ' (1) ·
'SR-404 EB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'SW 18TH ST ' (1) ·
'US-192 WB ' (1) ·
SR-A1A SB (1)
700023 (1) ·
700054 (1) ·
700058 (1) ·
700089 (1) ·
700128 (1) ·
700132 (1) ·
700145 (1) ·
700153 (1) ·
700210 (1) ·
700211 (1) ·
890126 (1) ·
930476 (1) ·
930533 (1) ·
935218 (1) ·
940126 (1) ·
940127 (1) ·
944011 (1)
'.25mi W OF I-95 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'US-192 WB-St Johns Relief' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)