Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'E-1 Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'ICWW ' (1) ·
'Lake Ida Road ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'WB SR 80 ' (1)
'DNLD RS RD E 112.2' (1) ·
'HATTON HIGHWAY ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB SR 807 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB SR 807 ' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR-76 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'Stribling Way ' (1)
790205 (1) ·
790207 (1) ·
890126 (1) ·
890127 (1) ·
890150 (1) ·
930261 (1) ·
930262 (1) ·
930335 (1) ·
930419 (1) ·
930450 (1) ·
930476 (1) ·
930495 (1) ·
930504 (1) ·
930530 (1) ·
930531 (1) ·
930532 (1) ·
930533 (1) ·
934301 (1) ·
934553 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'1 mile North of SR 704 ' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'StriblingWay ovr E-1canal' (1)
101541 (1) ·
104500 (1) ·
106500 (1) ·
116000 (1) ·
14600 (1) ·
16500 (1) ·
21500 (1) ·
29000 (1) ·
40500 (1) ·
47500 (1) ·
5500 (1) ·
555 (1) ·
6300 (1) ·
85750 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10930 (1) ·
148776 (1) ·
176174 (1) ·
181308 (1) ·
184778 (1) ·
201260 (1) ·
25331 (1) ·
28628 (1) ·
37302 (1) ·
50315 (1) ·
5500 (1) ·
70268 (1) ·
82412 (1) ·
963 (1)
Showing below up to 19 results in range #1 to #19.