Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'E-2 Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'ICWW ' (1) ·
'Lateral "A" Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral A Canal ' (1) ·
'Loxahatchee Slough ' (1) ·
'M CANAL ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-76 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'WB SR 80 ' (1) ·
Fellsmere Canal (1)
'33rd Street ' (1) ·
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'4th Street ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-630 (41st St.) ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'EB SR808 Glades Rd' (1) ·
'HATTON HIGHWAY ' (1) ·
'Hatton Road ' (1) ·
'NB SR 807 ' (1) ·
'Northlake Blvd. EB' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB SR 807 ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
I-95 SB (1)
700231 (1) ·
790205 (1) ·
790207 (1) ·
884074 (1) ·
884100 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
884104 (1) ·
890129 (1) ·
890150 (1) ·
930248 (1) ·
930419 (1) ·
930450 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1) ·
934151 (1) ·
934168 (1) ·
934552 (1) ·
934553 (1)
'1 Mi. S of US-441 ' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-613 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'South of St Lucie Canal ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR 808 I 95 Interchange ' (1) ·
Over Fellsmere Canal (1)
26220535 (1) ·
26222805 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
26424000 (1) ·
26455392 (1) ·
26470110 (1) ·
26483934 (1) ·
26525829 (1) ·
27063191 (1) ·
27122400 (1) ·
27363390 (1) ·
27391280 (1) ·
27393890 (1) ·
27400430 (1) ·
27403120 (1) ·
27405750 (1) ·
27493308 (1) ·
29060018 (1) ·
29064300 (1)
80045427 (1) ·
80045433 (1) ·
80045990 (1) ·
80070650 (1) ·
80075174 (1) ·
80101517 (1) ·
80103501 (1) ·
80113000 (1) ·
80153917 (1) ·
80182538 (1) ·
80264867 (1) ·
80274510 (1) ·
80274550 (1) ·
80274570 (1) ·
80274600 (1) ·
80274650 (1) ·
80325180 (1) ·
80331600 (1) ·
80332921 (1) ·
81083300 (1) ·
81091401 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.