Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'Canal L-14 ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'L-14 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'Troup Indiantown Canal ' (1) ·
'Turkey Creek ' (1) ·
'US 92 ' (1)
'2nd AVENUE NORTH ' (1) ·
'34th Avenue ' (1) ·
'Congress Ave. ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'E/B S.R. 704 ' (1) ·
'I-4 EB Ramp A ' (1) ·
'I-4 Ramp B ' (1) ·
'JOG ROAD ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'Port Malabar BL WB' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'US 192 WB ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1) ·
'W/B S.R. 704 ' (1)
700233 (1) ·
704097 (1) ·
704098 (1) ·
705920 (1) ·
790208 (1) ·
790248 (1) ·
885813 (1) ·
894053 (1) ·
930163 (1) ·
930457 (1) ·
930459 (1) ·
930506 (1) ·
930507 (1) ·
930525 (1) ·
930527 (1) ·
934179 (1) ·
934315 (1) ·
934364 (1)
'0.25 Mile N of Center St.' (1) ·
'0.3 Miles North of SR 60 ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-4 Connector over US-92 ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'US 192 WB over Indian Riv' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
122864 (1) ·
125788 (1) ·
130993 (1) ·
137065 (1) ·
20993 (1) ·
22121 (1) ·
28194 (1) ·
32098 (1) ·
4164 (1) ·
5040 (1) ·
6000 (1) ·
62460 (1) ·
6812 (1) ·
7981 (1) ·
9890 (1)
Showing below up to 18 results in range #1 to #18.