Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'DANFORTH CREEK ' (1) ·
'Drainage Canal ' (1) ·
'E 3.5 AIRPORT CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR 9) ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Rio Mar Bay ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1)
'CHERRY ROAD ' (1) ·
'CITRUS BLVD. ' (1) ·
'CR 76A ' (1) ·
'CR-4009 ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'Hood Road ' (1) ·
'Investment Lane ' (1) ·
'MAPP ROAD ' (1) ·
'OKEELANTA RD. ' (1) ·
'Port St. John Pkwy' (1) ·
'River Drive ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR70 WB Okeechobee' (1) ·
'WB SR-70 ' (1)
700199 (1) ·
794193 (1) ·
885812 (1) ·
890114 (1) ·
890141 (1) ·
890142 (1) ·
894059 (1) ·
894060 (1) ·
930285 (1) ·
930398 (1) ·
934162 (1) ·
934229 (1) ·
934291 (1) ·
934294 (1) ·
934522 (1) ·
940120 (1) ·
940136 (1) ·
944016 (1)
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.4 MILE EAST OF SR-809 ' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.5mi East of Indiantown' (1) ·
'100Ft. South of Bay Drive' (1) ·
'1mi. West of CR-613 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'AT US-27 ' (1) ·
'CR 76A over I-95 ' (1) ·
'Port St. John Pkwy - I-95' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.