Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'C-23 CANAL ' (1) ·
'DANFORTH CREEK ' (1) ·
'Drainage Canal ' (1) ·
'E 3.5 AIRPORT CANAL ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'Moore's Creek ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'North Relief Canal ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Rio Mar Bay ' (1) ·
'Ten Mile Creek ' (1)
'56th Place North ' (1) ·
'CHERRY ROAD ' (1) ·
'CITRUS BLVD. ' (1) ·
'CR 76A ' (1) ·
'Hood Road ' (1) ·
'Investment Lane ' (1) ·
'MAPP ROAD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'OKEELANTA RD. ' (1) ·
'River Drive ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR70 WB Okeechobee' (1) ·
'US-1 (SR-5) ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB SR-70 ' (1)
884082 (1) ·
885812 (1) ·
890110 (1) ·
890111 (1) ·
890114 (1) ·
890141 (1) ·
890142 (1) ·
894059 (1) ·
894060 (1) ·
930183 (1) ·
930398 (1) ·
934162 (1) ·
934229 (1) ·
934522 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940120 (1) ·
940136 (1) ·
940151 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.4 MILE EAST OF SR-809 ' (1) ·
'0.5 E of Military Trail ' (1) ·
'1 mile North of SR-70 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.5mi East of Indiantown' (1) ·
'100Ft. South of Bay Drive' (1) ·
'1mi. West of CR-613 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'56th Place North ' (1) ·
'AT US-27 ' (1) ·
'CR 76A over I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.