Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-23 CANAL ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'Cypress Creek ' (1) ·
'Donald Ross Road ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'L-14 CANAL ' (1) ·
'Long Creek ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR786 I95 I95 Ramps ' (1)
'BELVEDERE ROAD ' (1) ·
'CAMINO REAL ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'EB Prt St Lucie Bd' (1) ·
'Hood Road ' (1) ·
'JOG ROAD ' (1) ·
'LINTON BLVD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'OKEELANTA RD. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR-76 ' (1) ·
'SR786 WB to SB I95' (1) ·
'W/B S.R. 704 ' (1) ·
'WB St. Lucie Blvd.' (1)
890110 (1) ·
890116 (1) ·
890127 (1) ·
930183 (1) ·
930285 (1) ·
930382 (1) ·
930386 (1) ·
930387 (1) ·
930388 (1) ·
930398 (1) ·
934282 (1) ·
934315 (1) ·
934485 (1) ·
934522 (1) ·
934960 (1) ·
940070 (1) ·
940111 (1) ·
940140 (1) ·
940144 (1)
'.25 mi East of I-95 ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'2.5 miles North of SR-706' (1) ·
'2mi. East of SR-91 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'AT US-27 ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 over Midway Road ' (1) ·
'South of Ramp to SR 706 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.