Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-23 CANAL ' (1) ·
'Canal L-14 ' (1) ·
'Cypress Creek ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'Lake Ashby Canal ' (1) ·
'Long Creek ' (1) ·
'Moore's Creek ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1)
'CAMINO REAL ' (1) ·
'Congress Ave. ' (1) ·
'CR-512 ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'Lake Ashby Road ' (1) ·
'LINTON BLVD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I 95 SR 9 ' (1) ·
'OKEELANTA RD. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-76 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB St. Lucie Blvd.' (1)
794146 (1) ·
884068 (1) ·
890110 (1) ·
890116 (1) ·
890127 (1) ·
930163 (1) ·
930386 (1) ·
930387 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934485 (1) ·
934522 (1) ·
934960 (1) ·
940070 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
940151 (1)
'.25 mi East of I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1 mile North of SR-70 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'2.5 miles North of SR-706' (1) ·
'200ft. East of SR-415 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT US-27 ' (1) ·
'South of Ramp to SR 706 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)