Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service On 042a:
Highway - Pedestrian
& Deck 058:
Very Good
& Superstructure 059:
Good
Use the filters below to narrow your results.
884068 (1) ·
890150 (1) ·
894059 (1) ·
930183 (1) ·
930285 (1) ·
930304 (1) ·
930419 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1) ·
934162 (1) ·
934282 (1) ·
934297 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'SE quadrant PB Int Airpt ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.