Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 712 (Midway Road) ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'CR-712 Midway Road ' (1) ·
'Cypress Creek ' (1) ·
'Fellsmere Canal ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Gatlin Blvd ' (1) ·
'Little Lake Worth ' (1) ·
'SR 70 ' (1) ·
'SR-421 ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Tomoka River ' (1)
700232 (1) ·
790201 (1) ·
790202 (1) ·
790229 (1) ·
890116 (1) ·
930546 (1) ·
931002 (1) ·
940086 (1) ·
940087 (1) ·
940108 (1) ·
940109 (1) ·
940111 (1) ·
940112 (1) ·
940114 (1) ·
940126 (1) ·
940127 (1) ·
940135 (1)
'0.3 mi east of US 1 & PGA' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.5 miles North of SR-706' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 NB over SR-421 ' (1) ·
'I-95 over Midway Road ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'Over Fellsmere Canal ' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)