Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Donald Ross Road ' (1) ·
'Gatlin Blvd ' (1) ·
'Holly Drive ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Indian River ' (1) ·
'Lake Ida Road ' (1) ·
'Miami Canal L-25 ' (1) ·
'Palmetto Park Road ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'SR-91 (FL. TPK.) ' (1)
'CR 76A ' (1) ·
'Hood Road ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-95 (SR 9) ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 80/Southern Bld' (1) ·
'SR-406 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'US-27/SR-80 SB ' (1)
700227 (1) ·
890114 (1) ·
890126 (1) ·
930189 (1) ·
930199 (1) ·
930382 (1) ·
930398 (1) ·
930496 (1) ·
930517 (1) ·
930527 (1) ·
930538 (1) ·
940086 (1) ·
940087 (1) ·
940109 (1) ·
940111 (1) ·
940112 (1) ·
940126 (1) ·
940127 (1)
'.25mi W OF I-95 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'At John Stretch Park ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'Boca Raton ' (1) ·
'CR 76A over I-95 ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 over Midway Road ' (1) ·
'Just South of Exit 48 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'SR-406 over Indian River ' (1)
101541 (1) ·
102500 (1) ·
171500 (1) ·
21500 (1) ·
32250 (1) ·
37250 (1) ·
38750 (1) ·
3900 (1) ·
4000 (1) ·
70815 (1) ·
71250 (1) ·
7500 (1) ·
90500 (1) ·
9800 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
122864 (1) ·
123619 (1) ·
13012 (1) ·
157018 (1) ·
17003 (1) ·
176174 (1) ·
177838 (1) ·
297552 (1) ·
37302 (1) ·
55954 (1) ·
64629 (1) ·
67231 (1) ·
6766 (1) ·
6940 (1)
Showing below up to 18 results in range #1 to #18.