Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930259 (1) ·
930261 (1) ·
930262 (1) ·
930458 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
934301 (1) ·
934327 (1) ·
934367 (1) ·
935920 (1)
'0.6 mile South of SR 882 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Lake Worth ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1) ·
'South Side of US-98 ' (1) ·
'StriblingWay ovr E-1canal' (1)
10500 (1) ·
113000 (1) ·
116000 (1) ·
200 (1) ·
232000 (1) ·
23500 (1) ·
236000 (1) ·
39500 (1) ·
5500 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
18218 (1) ·
196055 (1) ·
201260 (1) ·
400 (1) ·
402520 (1) ·
40773 (1) ·
409460 (1) ·
5500 (1) ·
68532 (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)