Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'16th St/College Ln' (1) ·
'33rd Street ' (1) ·
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'57th Street ' (1) ·
'5th Street SW ' (1) ·
'CHERRY ROAD ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Lake Worth Road ' (1) ·
'Loxahatchee Slough' (1) ·
'Northlake Blvd. EB' (1) ·
'Stribling Way ' (1) ·
'US-1 (SR-5) ' (1)
884084 (1) ·
884085 (1) ·
884093 (1) ·
884100 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
930413 (1) ·
934167 (1) ·
934168 (1) ·
934229 (1) ·
934301 (1) ·
934327 (1) ·
940151 (1)
'0.4 MILE EAST OF SR-809 ' (1) ·
'1 mile North of SR-70 ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'5th St. SW at CR-611 ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'StriblingWay ovr E-1canal' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)