Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'90th Ave. ' (1) ·
'E-3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lake Ida Road ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'South Relief Canal ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'US-192 ' (1) ·
Addison Canal (1) ·
Wickham Road (1)
'Australian Ave. ' (1) ·
'BELVEDERE ROAD ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'LINTON BLVD ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR 9 (I-95) ' (1) ·
'US-1 (SR-5) ' (1) ·
'Woolbright Road ' (1) ·
I-95 (1)
700209 (1) ·
700222 (1) ·
700229 (1) ·
880089 (1) ·
880101 (1) ·
930261 (1) ·
930285 (1) ·
930301 (1) ·
930336 (1) ·
930496 (1) ·
930503 (1) ·
930525 (1) ·
930527 (1) ·
930529 (1) ·
934282 (1) ·
934485 (1)
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'1 mile West of US 1 ' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I 95 Exit 56 ' (1) ·
'I-95 over US-192 ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'North of P. Beach Airport' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
117980 (1) ·
118848 (1) ·
122864 (1) ·
125788 (1) ·
148776 (1) ·
176174 (1) ·
181308 (1) ·
201260 (1) ·
28628 (1) ·
47712 (1) ·
48823 (1) ·
63328 (1) ·
72870 (1) ·
75473 (1) ·
8000 (1) ·
84148 (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)