Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'Canoe Creek ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral B Canal ' (1) ·
'Lateral C Canal ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'Lateral H Canal ' (1) ·
'Moore's Creek ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1)
'16th St/College Ln' (1) ·
'53rd Street ' (1) ·
'Apollo Boulevard ' (1) ·
'Benoist Farms Rd ' (1) ·
'CR-4009 ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Spanish River Blvd' (1) ·
'SR A1A ' (1) ·
'SR-76 ' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'US-1 (SR-5) ' (1)
705604 (1) ·
794193 (1) ·
884071 (1) ·
884076 (1) ·
884083 (1) ·
884084 (1) ·
890110 (1) ·
890111 (1) ·
890127 (1) ·
930387 (1) ·
930447 (1) ·
930547 (1) ·
934291 (1) ·
934294 (1) ·
934711 (1) ·
935222 (1) ·
935223 (1) ·
940151 (1) ·
944016 (1)
'.25 mi East of I-95 ' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1 mile North of SR-70 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'At CR-613 ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'South of Ramp to SR 706 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)