Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'C-23 Canal ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'SR 70 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Ten Mile Creek ' (1)
'DNLD RS RD E 112.2' (1) ·
'EB SR706 ' (1) ·
'Forest Hill Blvd. ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (SB) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR-615 ' (1) ·
'Port St. John Pkwy' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-615 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'WB SR 706 ' (1) ·
'WB SR-70 ' (1)
700199 (1) ·
890111 (1) ·
930032 (1) ·
930419 (1) ·
930447 (1) ·
930453 (1) ·
930454 (1) ·
931002 (1) ·
931003 (1) ·
934271 (1) ·
934297 (1) ·
934327 (1) ·
940113 (1) ·
940114 (1) ·
940120 (1) ·
940126 (1) ·
940127 (1) ·
940135 (1) ·
940146 (1) ·
940147 (1)
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'300' E of FL Turnpike ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'Port St. John Pkwy - I-95' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)