Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Miami Canal L-25 ' (1) ·
'Palmetto Park Road ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 91 TPK ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'WB SR 80 ' (1)
'BELVEDERE ROAD ' (1) ·
'CR-512 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'I 95 NB ' (1) ·
'JOG ROAD ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR 807 ' (1) ·
'Port St. John Pkwy' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR 807 ' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 804 Boyton B B ' (1) ·
'US-27/SR-80 SB ' (1)
700199 (1) ·
884068 (1) ·
930199 (1) ·
930285 (1) ·
930419 (1) ·
930476 (1) ·
930527 (1) ·
930532 (1) ·
930533 (1) ·
930538 (1) ·
934282 (1) ·
934297 (1) ·
940086 (1) ·
940087 (1) ·
940111 (1) ·
940112 (1) ·
940126 (1) ·
940127 (1)
'0.5 MILE WEST OF JOG RD ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'At John Stretch Park ' (1) ·
'Boca Raton ' (1) ·
'I-95 over Midway Road ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'Port St. John Pkwy - I-95' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'SE quadrant PB Int Airpt ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.