Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'Blue Cypress Marsh ' (1) ·
'Danforth Creek ' (1) ·
'E-2 Canal ' (1) ·
'Header Creek Canal ' (1) ·
'Indian River Relief ' (1) ·
'L-78 Borrow Canal ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'Loxahatchee Slough ' (1) ·
'Miami Canal L-25 ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Padgett Branch Marsh ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Rio Mar Bay ' (1) ·
'SB I-95 To EB 706 ' (1) ·
'St. John's Marsh ' (1) ·
'St. Johns River Relief ' (1) ·
'Ten Mile Creek ' (1)
'6 Ave S to NB I-95' (1) ·
'Bay Drive ' (1) ·
'EB SR 70 ' (1) ·
'NB SR-615 ' (1) ·
'PGA Blvd (SR786) ' (1) ·
'Pioneer Road ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SB SR-615 ' (1) ·
'SR 70 EB ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-415 ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR70 EB Okeechobee' (1) ·
'US-192 EB ' (1) ·
'US-27/SR-80 NB ' (1) ·
'US-27/SR-80 SB ' (1) ·
'WB 706 To SB I-95 ' (1) ·
'WB SR - 714 ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
700234 (1) ·
790220 (1) ·
880092 (1) ·
880093 (1) ·
880095 (1) ·
880097 (1) ·
880099 (1) ·
885811 (1) ·
890135 (1) ·
930376 (1) ·
930478 (1) ·
930510 (1) ·
930511 (1) ·
930537 (1) ·
930538 (1) ·
930557 (1) ·
934468 (1) ·
934469 (1) ·
934721 (1) ·
940146 (1) ·
940147 (1) ·
940154 (1) ·
940156 (1) ·
940157 (1)
'0.1 Mile West of A1A ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'12.1Mi. E of SR-91 (TPK) ' (1) ·
'1mi. west of CR-613 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'7 MI W of FL TPK SR91 ' (1) ·
'At John Stretch Park ' (1) ·
'I 95 SR 706 interchange ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1) ·
'SR-415 -St. Johns Relief ' (1) ·
'US-192 EB - Indian Riv ' (1)
26304774 (1) ·
26304823 (1) ·
26363990 (1) ·
26364054 (1) ·
26402370 (1) ·
26404904 (1) ·
26414539 (1) ·
26414600 (1) ·
26502490 (1) ·
26555790 (1) ·
27102072 (1) ·
27220381 (1) ·
27222310 (1) ·
27233900 (1) ·
27280680 (1) ·
27280700 (1) ·
27382800 (1) ·
27382850 (1) ·
27382860 (1) ·
27382938 (1) ·
27382980 (1) ·
27395790 (1) ·
28051366 (1) ·
28485627 (1)
80040610 (1) ·
80040879 (1) ·
80040933 (1) ·
80060834 (1) ·
80060838 (1) ·
80090390 (1) ·
80102610 (1) ·
80102860 (1) ·
80161373 (1) ·
80205810 (1) ·
80205900 (1) ·
80214090 (1) ·
80272980 (1) ·
80295150 (1) ·
80324763 (1) ·
80345659 (1) ·
80430030 (1) ·
80433200 (1) ·
80443870 (1) ·
80475780 (1) ·
80482471 (1) ·
80482472 (1) ·
81112630 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)