Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'E3-canal ' (1) ·
'Eau Gallie River ' (1) ·
'L-5 Canal ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Rio Mar Bay ' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'Troup Indiantown Canal ' (1)
'Apollo Boulevard ' (1) ·
'Bay Drive ' (1) ·
'Benoist Farms Rd ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'Levee Road ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'Melaleuca Lane ' (1) ·
'Park Road ' (1) ·
'River Drive ' (1) ·
'SR A1A ' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'TEQUESTA DRIVE ' (1)
705604 (1) ·
884071 (1) ·
884104 (1) ·
885811 (1) ·
885812 (1) ·
894053 (1) ·
930447 (1) ·
930801 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
931012 (1) ·
934179 (1) ·
934361 (1) ·
934711 (1) ·
936776 (1) ·
940158 (1)
'0.1 Mile West of A1A ' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-613 ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR 91 at Jupiter Interch ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.