Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'L-14 CANAL ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral D Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'South Relief Canal ' (1) ·
'SR-40 ' (1) ·
'Ten Mile Creek ' (1) ·
'WPB CANAL C-51 ' (1)
'16th St/College Ln' (1) ·
'2nd AVENUE NORTH ' (1) ·
'66th Avenue ' (1) ·
'CAMINO REAL ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'CR605 Old Dixie ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'I-95 ' (1) ·
'Investment Lane ' (1) ·
'JOG ROAD ' (1) ·
'KIRK ROAD ' (1) ·
'Linton Blvd. ' (1) ·
'LYONS ROAD ' (1) ·
'SEMINOLE/PRATTWHT.' (1)
790193 (1) ·
884084 (1) ·
884086 (1) ·
884098 (1) ·
884099 (1) ·
934151 (1) ·
934162 (1) ·
934313 (1) ·
934315 (1) ·
934364 (1) ·
934751 (1) ·
934960 (1) ·
934986 (1) ·
944016 (1)
'0.4 MI W of US-1 ' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'I-95 over SR-40 ' (1) ·
'Inter 66th Ave/College Ln' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)