Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Barge Canal ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'BULLDOG CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CANAL E-4 ' (1) ·
'Drainage Ditch ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Halifax Canal ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'Service Rd & Canal ' (1) ·
'St. Johns River ' (1) ·
'St. Lucie River ' (1)
'53RD STREET ' (1) ·
'65TH ST. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'Babcock St(CR-507)' (1) ·
'Center Avenue ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'MISSION HILL ROAD ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SAVONA BLVD. ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-3 ' (1) ·
'SR-401 SB ' (1) ·
'SR-404 WB ' (1) ·
'SR-46 ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'WB Spanish River ' (1)
700030 (1) ·
700031 (1) ·
700072 (1) ·
700077 (1) ·
700110 (1) ·
700115 (1) ·
700160 (1) ·
704203 (1) ·
790030 (1) ·
795521 (1) ·
880049 (1) ·
880053 (1) ·
884024 (1) ·
884036 (1) ·
885601 (1) ·
890003 (1) ·
930154 (1) ·
930226 (1) ·
934516 (1) ·
935305 (1) ·
936550 (1) ·
937702 (1) ·
945256 (1)
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At Intersection w LPGA BL' (1) ·
'At Lake Washington Rd ' (1) ·
'Babcock Street over I-95 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26231074 (1) ·
26231130 (1) ·
26294400 (1) ·
26400360 (1) ·
26450312 (1) ·
26490288 (1) ·
27121243 (1) ·
27161021 (1) ·
27370119 (1) ·
27412374 (1) ·
27424275 (1) ·
27453074 (1) ·
27453510 (1) ·
27591190 (1) ·
28085200 (1) ·
28122319 (1) ·
28241003 (1) ·
28241828 (1) ·
28242777 (1) ·
28243313 (1) ·
28243314 (1) ·
28425058 (1) ·
29143174 (1)
80040599 (1) ·
80041209 (1) ·
80041536 (1) ·
80044085 (1) ·
80044331 (1) ·
80154065 (1) ·
80231068 (1) ·
80250470 (1) ·
80274465 (1) ·
80274529 (1) ·
80284675 (1) ·
80290638 (1) ·
80371922 (1) ·
80375608 (1) ·
80375690 (1) ·
80384625 (1) ·
80390071 (1) ·
80422154 (1) ·
80424100 (1) ·
80440519 (1) ·
80491520 (1) ·
81020286 (1) ·
81030053 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)