Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Deep Creek ' (1) ·
'I-4 ' (1) ·
'IWW Indian River ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lake Washington Road ' (1) ·
'Middle Haw Creek ' (1) ·
'Padgett Creek ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'Sawgrass Creek ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-442 ' (1) ·
'SR-518 ' (1) ·
'Tide Relief Canal ' (1) ·
Lake Washington Road (1)
700018 (1) ·
700043 (1) ·
700117 (1) ·
700122 (1) ·
700123 (1) ·
790033 (1) ·
790035 (1) ·
790053 (1) ·
790062 (1) ·
790099 (1) ·
790172 (1) ·
790920 (1) ·
930361 (1) ·
940049 (1) ·
940082 (1)
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'A1A on Singer Island ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-95 NB -Lk Washington Rd' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'US-192EB - Sawgrass Creek' (1) ·
I-95 SB -Lk Washington Rd (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.