Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boca Inlet ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-5 Canal ' (1) ·
'Lake Worth Tide Relief' (1) ·
'MIAMI CANAL ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'Sebastian Inlet ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-518 ' (1) ·
'St. Lucie River ' (1) ·
'TEN MILE CREEK ' (1) ·
INDIAN RIVER (1)
'A1A ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'I-95 NB ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'NB US-27 SR-25 ' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-404 WB ' (1) ·
'SR-A1A ' (1) ·
'SR80(SouthernBlvd)' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR 802 Lake Ave' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
700031 (1) ·
700077 (1) ·
700117 (1) ·
700122 (1) ·
703001 (1) ·
703002 (1) ·
880005 (1) ·
890003 (1) ·
930004 (1) ·
930060 (1) ·
930098 (1) ·
930104 (1) ·
930239 (1) ·
930353 (1) ·
930416 (1) ·
934502 (1) ·
936550 (1) ·
940015 (1)
'0.25mi W of S.R.-A1A ' (1) ·
'0.2MI S OF EDWARDS RD ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'I-95 NB SR-518 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
KENNEDY SPACE CENTER (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)