'BRANCH OF MIAMI CANAL ' (1) ·
'C-24 CANAL ' (1) ·
'Deep Creek ' (1) ·
'Dirksen Drive ' (1) ·
'El Rio Canal E-4 ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'FEC Railroad ' (1) ·
'Halifax Canal ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Ashby Canal ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'Relief E.of North Bridge' (1) ·
'SR-442 ' (1) ·
'SR-518 ' (1) ·
'SR-524 ' (1) ·
'TEN MILE CREEK ' (1) ·
'Tide Relief Canal ' (1) ·
'WPB CANAL C-51 ' (1)
'CARLTON RD (CR613)' (1) ·
'Center Avenue ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'DUDA ROAD ' (1) ·
'I-4 Ramp ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SR-415 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR-A1A ' (1) ·
'SUMMIT BLVD ' (1) ·
'WB SR 802 Lake Ave' (1)
700054 (1) ·
700122 (1) ·
790023 (1) ·
790033 (1) ·
790035 (1) ·
790042 (1) ·
790062 (1) ·
795521 (1) ·
885601 (1) ·
930104 (1) ·
930319 (1) ·
930339 (1) ·
930361 (1) ·
934201 (1) ·
934332 (1) ·
934516 (1) ·
934519 (1) ·
940015 (1) ·
940019 (1) ·
940035 (1) ·
940046 (1) ·
940047 (1)
'0.2MI S OF EDWARDS RD ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1MI W of US-1 ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'500FT WEST OF I-95 ' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'A1A on Singer Island ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Intersection w LPGA BL' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'City of Jupiter ' (1) ·
'I-4 EB Ramp - I-95 ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-415 - Lake Ashby Canal' (1)
26214420 (1) ·
26344632 (1) ·
26365544 (1) ·
26395767 (1) ·
26400360 (1) ·
26401808 (1) ·
26490902 (1) ·
26565506 (1) ·
27201783 (1) ·
27222772 (1) ·
27241547 (1) ·
27263922 (1) ·
27284570 (1) ·
27453074 (1) ·
28071404 (1) ·
28222787 (1) ·
28521781 (1) ·
28535974 (1) ·
28563417 (1) ·
28570267 (1) ·
29092639 (1) ·
29143174 (1)
80022456 (1) ·
80022882 (1) ·
80042609 (1) ·
80052130 (1) ·
80052259 (1) ·
80054930 (1) ·
80184630 (1) ·
80192646 (1) ·
80203293 (1) ·
80215950 (1) ·
80290638 (1) ·
80324598 (1) ·
80381684 (1) ·
80422093 (1) ·
80481590 (1) ·
80491520 (1) ·
80570342 (1) ·
81030053 (1) ·
81043623 (1) ·
81060965 (1) ·
81080270 (1) ·
81170430 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)