Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service On 042a:
Highway - Pedestrian
& Deck 058:
Satisfactory
& Superstructure 059:
Good
Use the filters below to narrow your results.
'Eau Gallie River ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Elbow Creek ' (1) ·
'ICWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'Loxahatchee River ' (1) ·
'Reed Canal ' (1) ·
'Relief E.of North Bridge' (1) ·
'St. Johns River ' (1) ·
'Tomoka River ' (1) ·
Indian River ICW (1)
700007 (1) ·
700008 (1) ·
700184 (1) ·
790027 (1) ·
790030 (1) ·
790148 (1) ·
790152 (1) ·
796500 (1) ·
930269 (1) ·
930319 (1) ·
930339 (1) ·
940046 (1) ·
940094 (1)
'0.5mi. East of US-1 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'City of Jupiter ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'South Causeway over ICWW ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'SR-A1A over Halifax River' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
SR-518 over Indian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 13 results in range #1 to #13.