Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Deck 058:
Satisfactory
& Scour 113:
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.
Use the filters below to narrow your results.
880005 (1) ·
880062 (1) ·
880077 (1) ·
930004 (1) ·
930060 (1) ·
930154 (1) ·
930226 (1) ·
930322 (1) ·
930339 (1) ·
934408 (1) ·
940094 (1)
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'City of Jupiter ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'South Causeway over ICWW ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)