Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR712 MDWYRD 150.3' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 158.6 ' (1)
890068 (1) ·
890082 (1) ·
890085 (1) ·
930142 (1) ·
930159 (1) ·
930239 (1) ·
930334 (1) ·
930416 (1) ·
940049 (1) ·
940050 (1) ·
940058 (1) ·
940082 (1)
'1.0MI NORTH OF SR-708 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)