Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12116 (1) ·
12117 (1) ·
12118 (1) ·
12130 (1) ·
12131 (1) ·
12154 (1) ·
12184 (1) ·
12197 (1) ·
12207 (1) ·
12246 (1) ·
13670 (1) ·
13673 (1) ·
13678 (1) ·
13681 (1) ·
13709 (1) ·
13726 (1) ·
13741 (1) ·
13753 (1) ·
15142 (1) ·
15144 (1) ·
15607 (1) ·
15629 (1) ·
15647 (1) ·
15666 (1) ·
15676 (1) ·
15688 (1)
'Banana River Relief East' (1) ·
'Dirksen Drive ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Elbow Creek ' (1) ·
'FECRR ' (1) ·
'Halifax River ' (1) ·
'I-4 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'Loxahatchee River ' (1) ·
'Padgett Creek ' (1) ·
'Service Rd & Canal ' (1) ·
'St. Johns River ' (1) ·
'Tide Relief Canal ' (1) ·
'Tomoka River ' (1) ·
'Turkey Creek ' (1)
'EB Spanish Rvr Bvd' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'SR A1A ' (1) ·
'SR-40 WB ' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR-46 ' (1) ·
'SR-472 EB ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-520 EB ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR-A1A ' (1) ·
'US-1 ' (1) ·
'WB Spanish River ' (1)
700007 (1) ·
700008 (1) ·
700012 (1) ·
700030 (1) ·
700031 (1) ·
700082 (1) ·
700117 (1) ·
700137 (1) ·
700148 (1) ·
700203 (1) ·
790027 (1) ·
790030 (1) ·
790042 (1) ·
790053 (1) ·
790099 (1) ·
790147 (1) ·
790172 (1) ·
790941 (1) ·
880051 (1) ·
880053 (1) ·
930154 (1) ·
930226 (1) ·
930269 (1) ·
930319 (1) ·
930339 (1) ·
930361 (1)
'0.5mi. East of US-1 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'City of Jupiter ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB-Banana River ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'US-1 - FECRR ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1 over Turkey Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26214420 (1) ·
26231074 (1) ·
26231130 (1) ·
26465867 (1) ·
26490902 (1) ·
26565506 (1) ·
27452066 (1) ·
27453510 (1) ·
28015978 (1) ·
28070512 (1) ·
28072700 (1) ·
28124312 (1) ·
28124379 (1) ·
28212281 (1) ·
28243313 (1) ·
28243314 (1) ·
28243318 (1) ·
28370979 (1) ·
28425058 (1) ·
28520760 (1) ·
28520804 (1) ·
28521781 (1) ·
28571848 (1) ·
29021928 (1) ·
29083964 (1) ·
29151780 (1)
80022456 (1) ·
80025351 (1) ·
80041209 (1) ·
80041536 (1) ·
80052130 (1) ·
80054930 (1) ·
80250470 (1) ·
80252909 (1) ·
80344732 (1) ·
80371385 (1) ·
80371403 (1) ·
80374336 (1) ·
80375049 (1) ·
80375518 (1) ·
80375608 (1) ·
80375690 (1) ·
80430520 (1) ·
80483851 (1) ·
80542264 (1) ·
80590233 (1) ·
81020286 (1) ·
81072482 (1) ·
81152780 (1) ·
81170430 (1) ·
81170942 (1) ·
81171026 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 26 results in range #1 to #26.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)