Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
58725 (1) ·
74625 (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Cape Canaveral (1) ·
DeBary (1) ·
Deltona (1) ·
Jupiter (1) ·
Jupiter Inlet Colony (1) ·
Lake Park (1) ·
Melbourne (1) ·
New Smyrna Beach (1) ·
Ormond Beach (1) ·
Palm Bay (1) ·
Port Orange (1) ·
Riviera Beach (1) ·
South Daytona (1) ·
West Palm Beach (1)
'Banana River ' (1) ·
'BRANCH OF ICWW ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'Dirksen Drive ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Elbow Creek ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'Loxahatchee River ' (1) ·
'Padgett Creek ' (1) ·
'Reed Canal ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SR 710 & SCL RR ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-442 ' (1) ·
'St. Johns River ' (1) ·
'Tomoka River ' (1) ·
Indian River ICW (1)
'Babcock St(CR-507)' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 SB ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'S. LAKE DRIVE ' (1) ·
'SR A1A ' (1) ·
'SR-40 WB ' (1) ·
'SR-44 ' (1) ·
'SR-46 ' (1) ·
'SR-472 EB ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-528 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'US-1 ' (1) ·
SR-518 (1)
700007 (1) ·
700008 (1) ·
700028 (1) ·
700160 (1) ·
700184 (1) ·
790027 (1) ·
790030 (1) ·
790042 (1) ·
790053 (1) ·
790062 (1) ·
790099 (1) ·
790148 (1) ·
790152 (1) ·
790941 (1) ·
796500 (1) ·
880053 (1) ·
930142 (1) ·
930159 (1) ·
930269 (1) ·
930319 (1) ·
930339 (1) ·
934126 (1) ·
935303 (1) ·
940082 (1)
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.7MI W OF SR-401 ' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'Babcock Street over I-95 ' (1) ·
'City of Jupiter ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-A1A over Halifax River' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
'WEST PALM BEACH INTERCH. ' (1) ·
SR-518 over Indian River (1)
26214420 (1) ·
26291118 (1) ·
26423954 (1) ·
26465867 (1) ·
26474455 (1) ·
26562485 (1) ·
26565506 (1) ·
27154501 (1) ·
27453510 (1) ·
27591190 (1) ·
28070512 (1) ·
28072700 (1) ·
28075792 (1) ·
28241892 (1) ·
28425058 (1) ·
28520760 (1) ·
28520804 (1) ·
28521781 (1) ·
28570267 (1) ·
28571848 (1) ·
29012564 (1) ·
29085374 (1) ·
29092052 (1) ·
29151780 (1)
80025351 (1) ·
80041914 (1) ·
80044372 (1) ·
80052130 (1) ·
80054930 (1) ·
80075399 (1) ·
80081956 (1) ·
80210806 (1) ·
80250470 (1) ·
80370269 (1) ·
80371922 (1) ·
80374336 (1) ·
80375049 (1) ·
80384626 (1) ·
80550332 (1) ·
80570342 (1) ·
80583172 (1) ·
81005885 (1) ·
81020286 (1) ·
81072482 (1) ·
81152780 (1) ·
81170430 (1) ·
81170942 (1) ·
81171026 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)