Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'Drainage Ditch ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Halifax Canal ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'ICWW ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'Loxahatchee River ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'Relief E.of North Bridge' (1) ·
'Sebastian Inlet ' (1) ·
'SR 710 & SCL RR ' (1) ·
'St. Johns River ' (1)
'Center Avenue ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'DUDA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SAVONA BLVD. ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR A1A ' (1) ·
'SR AIA ' (1) ·
'SR-44 ' (1) ·
'SR-46 ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'US-1 ' (1) ·
'Willowood Drive ' (1)
700007 (1) ·
700008 (1) ·
704032 (1) ·
704203 (1) ·
790030 (1) ·
790152 (1) ·
795521 (1) ·
880005 (1) ·
880051 (1) ·
880053 (1) ·
880077 (1) ·
885601 (1) ·
930159 (1) ·
930239 (1) ·
930269 (1) ·
930339 (1) ·
934516 (1) ·
934519 (1) ·
936550 (1) ·
940035 (1) ·
940046 (1) ·
940094 (1) ·
945256 (1)
'.21 E of Minton Rd. ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1MI W of US-1 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Intersection w LPGA BL' (1) ·
'At Lake Washington Rd ' (1) ·
'City of Jupiter ' (1) ·
'South Causeway over ICWW ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
26400360 (1) ·
26401808 (1) ·
26465867 (1) ·
26474455 (1) ·
26490288 (1) ·
26554196 (1) ·
26565506 (1) ·
27161021 (1) ·
27222772 (1) ·
27272767 (1) ·
27284570 (1) ·
27375640 (1) ·
27452066 (1) ·
27453074 (1) ·
27453510 (1) ·
27513635 (1) ·
28030000 (1) ·
28070512 (1) ·
28072700 (1) ·
28085200 (1) ·
28425058 (1) ·
29012564 (1) ·
29143174 (1)
80025351 (1) ·
80040599 (1) ·
80052130 (1) ·
80075399 (1) ·
80090356 (1) ·
80184630 (1) ·
80190872 (1) ·
80203293 (1) ·
80221680 (1) ·
80231068 (1) ·
80250470 (1) ·
80252909 (1) ·
80265430 (1) ·
80290638 (1) ·
80374336 (1) ·
80375049 (1) ·
80381684 (1) ·
80400400 (1) ·
80424100 (1) ·
80491520 (1) ·
80550332 (1) ·
81020286 (1) ·
81030053 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)